House Update

they painted the wrong address on our home - doh!

We had a little lull in our house progress due to all the holidays and cold cold weather.  But this week they started moving again and it is going up fast!  They finished up the walls and some footings in the basement and then moved on to framing!  They had the basement framed for a little while and blocked it all off with heaters in the basement to allow for cement curing? (I think)  This week they started the main floor framing and it went up really fast.  We headed over there this evening to take some pictures and do some measuring to make sure everything is the right size.  So far so good.  We have picked out plumbing, siding, and door style so far.  We are working on flooring this week and will hopefully have that picked out soon.

basement walls poured - this is the half egress window in one of the bedrooms

working on the footings in the basement

driveway (not poured)

basement framed walls (everything is boarded up so they can keep the basement warm)

chad checking under the cover

the back of the house with the windows boarded up

January 5th boards are delivered!

They started framing the upstairs

callan standing in front of the 2 stall garage

back of the house. daylight windows in the basement not boarded

one of the framed walls in the basement

standing in the master bedroom looking out to the kitchen

standing in the kitchen-the stairs will go in the black empty space-living room and entry way.

looking into Callan's room upstairs

main door-den window- and part of the garage

half egress window in the basement

another look at the back of the house

a dark picture I took from the egress into the basement

east side of the house.  the window goes into the master bathroom